Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Overview


The Compliance Dashboard provides a snapshot of an organization's compliance posture and as well as its progression through time.

There are several sections on the dashboard that provide detailed metrics around program status and control health.

Accessing the Compliance Dashboard


To access the Compliance Dashboard, complete the following:

  1. Click Dashboard | Compliance Dashboard.



Program Status


The Program Status section displays all programs in your organization's instance. This alphabetical list provides a status statuses for two different phases in a program's timeline. 
Those
Image Added

Overview of Program Status Phases

The two phases displayed in the Program Status section are as follows:

  • Onboarding Phase - The program has no completed auditaudits. This phase checks objective mappings through PSSOC hierarchy, which is done in the Program Onboarding Wizard.
  • Audit Phase - The program has at least one completed audit.

Note
titleIMPORTANT

Both phases display

a

the same low, moderate or high

status

icons.

The phases

They are only differentiated by

the

text on mouse hover and

the metrics displayed on click.

Image Removed

metrics shown after clicking the linked program.

Hints on how to tell them apart are outlined in the next documentation sections.

Understanding Onboarding Phase Readiness

If a program is still in the onboarding phase, the message displayed on mouse hover provides percentages of objectives that have mapped controls. This program may have active audits, but if it has no completed audits, there are no metrics to display for control health.



Onboarding phase status definitions are as follows:

  • Low - No objectives are scoped or control mappings are less than 40 percent. 
  • Moderate Control mappings are equal or greater than 40 percent and less than 80 percent. 
  • High - Control mappings are equal or greater than 80 percent. 

Tip
titleTIP

The control percentages are only calculated on objectives scoped to the program.

Understanding Audit Phase Readiness

If a program is in the audit stage, which means it has at least one completed audit, the message displayed on mouse hover provides percentages of effective controls in the last audit.



Audit phase status definitions only cover the last completed audit and are as follows:

  • Low - Over 80 percent of control assessments are deemed ineffective either by design or operation.
  • Moderate Over 30 percent and less than or equal to 80 percent are deemed ineffective either by design or operation.
  • High - Less than or equal to 30 percent of control assessments are deemed ineffective either by design or operation.

Tip
titleTIP

If an assessment is mapped to multiple objects, the only one assessment used for calculations is the one mapped to a control used in the last completed audit.

High Risk Entities


The High Risk Entities section reports the top three object types associated with high risk scores, which then provides an organization with the focus for risk mitigation.

Image Added

Understanding High Risk Entities

 In order to display in the The High Risk Entities section , objects must have at least one high risk mapped with a score that is greater than or equal to 20.In addition, a risk only displays if it is mapped to displays three objects with the greatest number of high risk items. Only the following are included in this section's calculation:

  • The entity must be one of the following objects:

    • Contract
    • Control
    • Org Group
    • Data Asset
    • Process
    • Objective
    • Product
    • Program
    • Threat
    • Policy
    • Issue
    • Market
  • The entity must have at least one item classified as high risk.

  • The top three entities with the most high risks are displayed with their counts from left to right. 

Issues


The Issues section of the Compliance Dashboard displays the top five outstanding issues in  ZenGRC. This should then be your compliance team's focus for the next time period.

  • up to 5 non truncated titles of issues
    • in states Identified, Assigned or Remediation in progress
    • sort by age, oldest on top
  • Get issues from the entire system
  • List all objects mapped to issue separated by newline
  • age is calculated as number of days since issue creation
  • on click pass send user to the issue card/info panel/page (whichever exists at the point of implementation)

Future Gap Analysis

Risk Heatmap

Scaled

Image Added

Understanding the Issues Section

The Issues section displays columns with the following criteria:

  • Top 5 issues - This column pulls all issues in the ZenGRC application that are set to one of the following statuses (other statuses are ignored):
    • Identified.
    • Assigned.
    • Remediation in progress.
  • Associated Entities - All objects mapped to the displayed issue.
  • Age - The number of days shown in red since each issue was created.

Future Gap Analysis


The Future Gap Analysis section provides the estimated level of effort for achieving compliance with a new framework based on overlapping frameworks in your ZenGRC System of Record.

The section only pulls programs still in a Draft status.

Image Added

Understanding the Future Gap Analysis Section

The Issuessection displays columns with the following criteria:

  • Program - These are draft programs with at least one mapped objective.
  • Objectives not met - The number of objectives in the draft program not scoped to other finalized programs. These objectives still need to be covered.
  • Objectives potentially met - The number of objectives in the draft program that could be potentially met by objectives in a related finalized program.
  • Estimated coverage - Estimate of objective overlap between the finalized and draft programs to show effort in finalizing the draft program.

Risk Heatmap


clicking on the scaled down risk heat map takes me to the risk heat map pageselect the box I clicked on

The Risk Heatmap section is a scaled-down report on risks the organization is facing along with the likelihood and impact. This provides risk severity and how soon do we have to take the action.

  • display a scaled down risk heat map here (/risk_heatmap)
  • action is necessary.

    Click one of the cubes on the grid to open the Risk Heatmap module.

    Info
    titleNOTE

    For additional information, please see Risk Heatmap.


    Image Added

    Individual Program Status


    metrics regarding the control efficiency of the selected program

    Accessing Individual Program Metrics

    On the Compliance Dashboard, complete the following:

    1. Click the a linked program in the Program Status section.

    Control Health Metrics

    metrics for control efficiency for the selected program

    • count controls mapped to the selected programthrough the PSSOC hierarchyand evaluate effectivenessbased on last assessment mapped to the control whose audit has been completed
      • take into consideration the last completed audit:
        • 1st level sorting: "Audited period end" date
        • 2nd level sorting (if 1st level not available or its tied): date when audit was completed
      • count of effective controls
      • count of ineffective controls
      • show effectiveness count: effectives control/all control
        • show gauge color:
          • 0-60%60 percent: red
          • 61%61 percent-80%80 percent: orange
          • 81% 81 percent and above: green
      • show audit readiness badge for program (same as for all programs, user story no. 3 in this spec)
    • Click on Effectiveness metrics or on the round percentage: take the user to the SoR listing for controls
        • filters applied: map:program
        • workaround for now: old SOR, go to program page, controls tab

    Section Status

    all the sections for this program with metrics about mapped objectives and controls count and highlighted with colors based on control effectiveness

    • display all sections mapped up the hierarchy (to the standard and program)
    • Show objective and controlcount
      • Objective count: all objectives mapped to the section
      • Control count: cumulative sum of all controls mapped to each objective (per section)
    • Objective count: objectives mapped to the section, standard, and program (all the way up in the hierarchy)
    • Display frame around each section color:
      • Green: more than 80% 80 percent of the objectives have at least one control mapped
      • Orange: between 50% 50 percent and 80% 80 percent of the objectives have t least one control mapped
      • Red: let than 50% 50 percent of the objectives have at least one control mapped
    • Hover on the "badge" same as in US#4 (see above)
    • on click take to the SoR objective list:
      • filter is applied: map:program
      • filter is applied: map:section
      • visible column selected: map:control
      • workaround for now: old SOR, go to program page, controls tab

    High Risk Entities

    the top 3 highest risk entities for a specific program.

    • display top three high risk entities mapped to objects that are mapped to specific program

    Top Five Issues

    the top five outstanding issues regarding a specific program

    • up to 5 non truncated titles and descriptions for issues mapped to this specific program

    Risk Matrix

    This section displays risks for the selected  program and at what likelihood and what impact, so I can decide on risk severity and how soon do we have to take the action

    • display a scaled down risk heat map here (/risk_heatmap) only with risks mapped to this specific program
      • filter risk heat map for that specific program if on a single program view
    • clicking on the scaled down risk heat map takes me to the risk heat map page
      • select the box I clicked on
      • if a program is selected keep the same program filter